PayEzy Owner Dashboard
PayEzy Payroll build · target: first client live the week of 15 March 2027 · live from the PayEzy Payroll Jira board
— of — pieces of work are built and tested. The plan expected about — by now. Over the last two weeks the team finished — a week; to go live in mid-March it needs about — a week from here.
Compared with the plan
Loading…
Current plan week: — · the plan expected — done by now · — are done.
Built and tested
— done, — still to finish
Built, waiting for testing
Developers have finished these; a tester still has to check them. A long queue here means testing is the bottleneck.
Finished per week
Needed from here: — a week, over — working weeks left (Christmas counted as half).
Last 7 days
— new pieces of work were added in the same week. If more is added than finished, the finish line moves away.
Open bugs found by testers
Problems testers found that are not yet fixed. Normal during a build; it should not keep climbing.
Progress against the plan, week by week
Each point is the end of a plan week. The space between the green “Built and tested” line and the dashed plan line is the difference from the plan. The grey line is all the work we know about; when it rises, the job got bigger.
Where every piece of work is right now
All the work in the PayEzy Payroll project, by stage. “Not started” includes items still waiting for someone to agree what “finished” means.
This week and next
What the plan says should be finished. “Should be done by end of week” is the running total the plan expects.
| Week | Starts | What should finish | Should be done by end of week | Milestone |
|---|
Milestones to go-live
The big moments in the plan. Jira can't tell us whether a milestone is truly reached, so this shows when each is due; the progress chart above shows whether the work behind it is keeping up.
| Week | Week of | Milestone | Status |
|---|
What we need from the directors
Decisions and documents that cost no developer time but can each stop the go-live date. These are Jira tasks labelled director-decision: set the due date in Jira, and move a task to Done when it is sorted.
| Needed by | What | Where it stands | Status |
|---|
Directors' notes
Notes for the other directors. Everyone who can sign in sees them; you can attach files (up to 4 MB) to your own notes, and delete them.
Week by week
The figures as they stood each Monday morning, newest first. Recorded automatically and kept, so they do not change if work is edited in Jira later.
| Week of | Plan week | Done | Plan expected | All known work | Waiting for testing | Open bugs |
|---|
Progress by part of the product
Green is built and tested, amber is built and waiting for testing.
| Part of the product | Done | Total |
|---|
Finished in the last 7 days
Work a tester has signed off this week, newest first.
| Date | What |
|---|
How these numbers are counted
- Done means a tester has checked it (Jira status “Done”), not just that a developer finished coding.
- In scope: stories and tasks in the PayEzy Payroll (PY) Jira project. Left out: epics, bugs (shown separately), items marked “Won't Do”, director decisions, Andrew's design deliverables, work deferred to version 2, the parked in-house calculation engine (E0–E13) and the deferred switch-over work (W6.5).
- Plan line and weekly targets come from the “PayEzy Payroll: the week-by-week plan” of 12 November 2026. Weeks 1–4 show what was reported for those weeks.
- Compared with the plan is how many pieces of work are done, against how many the plan expected by now: the plan's running total at the end of last week, plus the share of this week's planned work that matches how far through the week we are.
- Numbers come from Jira and are at most 5 minutes old. “Refresh” asks Jira again.
- Week by week is recorded automatically every Monday morning and kept, so it does not change if work is later edited in Jira.